Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Home/

Case Center/

Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing/

Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Project Overview

Area:

Asia / China

Room Type:

Modular House

Field:

Emergency and Events

Area:

10000㎡-200000㎡

Scenes:

Accommodation Medical

Time:

2022year

Project Features:

1.The project is located in Xiji, Tongzhou, where 6 enterprises, including Chengdong, and 8 major types of work are intersected. During the peak period, more than 200 construction personnel were invested to overcome complex coordination problems, and the main construction of 34 buildings in the first phase was completed in only 30 days, which is more than 40% shorter than the construction period of conventional emergency projects.

2. The project functions cover the emergency needs of the whole scene, and the support capacity can be tested digitally: 3,500 approved beds and 1,300 open beds are built according to the standard of Class I emergency shelters. The per capita effective shelter area is not less than 3.5 square meters, which can meet the emergency resettlement needs of more than 2,000 people for more than 30 days. For major events such as large-scale conferences and important competitions, it can respond to medical needs within 3 minutes and complete emergency response within 10 minutes.

3. From site layout to facility configuration, it strictly follows the "Building Technical Regulations for Modular Emergency Infectious Disease Hospital". The acceptance rate of modular components is 100%, and 100% of steel structure welds pass UT testing. Use data to build a strong safety bottom line.